MH State Board All Notes Free5th to 12th & BA, BSc, B.Com 🔍

Class 12 Mathematics and Statistics (Commerce) Part 2 – Daily Revision MCQ (English Medium)

📅 27 October 2026 · 10 questions · from the Balbharati textbook

This is the set for 27 October 2026. Solve today's MCQs →

Timed quiz: 15 seconds per question, the next one loads by itself when time runs out. Or solve without the timer: tap an option, right turns green, wrong turns red. 10 new questions every morning at 8.

  1. On a bill, the banker's discount is ₹1,260 and the true discount is ₹1,200. What is the banker's gain?

    Chapter 1: Commission, Brokerage and Discount

    Show answer

    Answer: A. ₹60
    Banker's gain = B.D. − T.D. = 1,260 − 1,200 = ₹60.

  2. A property is insured for ₹2,00,000 at a rate of premium of 0.5%. How much premium is paid?

    Chapter 2: Insurance and Annuity

    Show answer

    Answer: B. ₹1,000
    Premium = 0.5% of the insured value = (0.5/100) × 2,00,000 = ₹1,000.

  3. The regression line of Y on X is Y = 3 + 2X, and the mean of X is x̄ = 5. What is the mean of Y?

    Chapter 3: Linear Regression

    Show answer

    Answer: C. 13
    Every regression line passes through (x̄, ȳ), so ȳ = 3 + 2 × 5 = 13.

  4. For two variables, r = 0.5, σX = 2 and σY = 6. What is the regression coefficient bYX?

    Chapter 3: Linear Regression

    Show answer

    Answer: D. 1.5
    bYX = r × σY/σX = 0.5 × 6/2 = 1.5.

  5. The yearly values of a time series are 12, 15, 18, 21. What is the FIRST 3-yearly moving average?

    Chapter 4: Time Series

    Show answer

    Answer: B. 15
    The first 3-yearly moving average = (12 + 15 + 18)/3 = 45/3 = 15.

  6. Laspeyre's price index number is 144 and Paasche's price index number is 100. What is Fisher's ideal price index number?

    Chapter 5: Index Numbers

    Show answer

    Answer: A. 120
    Fisher's index = √(Laspeyre's × Paasche's) = √(144 × 100) = √14400 = 120.

  7. In a linear programming problem, the conditions x ≥ 0 and y ≥ 0 are called:

    Chapter 6: Linear Programming

    Show answer

    Answer: C. non-negativity constraints
    Decision variables cannot be negative, and the conditions x ≥ 0, y ≥ 0 that impose this are called non-negativity constraints.

  8. While sequencing n jobs on two machines A and B (order AB), the smallest processing time of all is found on machine B for job J. Where is job J placed in the sequence?

    Chapter 7: Assignment Problem and Sequencing

    Show answer

    Answer: D. Last
    In the optimal sequence algorithm, if the minimum time is on machine B, that job is placed last; if it is on machine A, the job is placed first.

  9. A discrete random variable X takes values 0, 1, 2 with P(X = 0) = 0.2, P(X = 1) = k and P(X = 2) = 0.5. What is k?

    Chapter 8: Probability Distributions

    Show answer

    Answer: B. 0.3
    The probabilities of a probability distribution add up to 1: 0.2 + k + 0.5 = 1, so k = 0.3.

  10. A random variable X follows a Poisson distribution with mean 3. What is its variance?

    Chapter 8: Probability Distributions

    Show answer

    Answer: A. 3
    For a Poisson distribution, mean = variance = m, so the variance is 3.

📘 Notes for this subject📚 Balbharati textbook PDF📝 All subjects MCQ

Class 12: MCQ in other subjects

English (Yuvakbharati)Marathi (Yuvakbharati)Hindi (Yuvakbharati)Book-Keeping and AccountancyEconomicsOrganisation of Commerce and ManagementSecretarial PracticeMathematics and Statistics (Commerce) Part 1

Previous days

All questions are written by PadhaiNotes in our own words from the chapters of the official Maharashtra State Board Balbharati textbook (ebalbharati.in). Each question shows its chapter.