MH State Board All Notes Free5th to 12th & BA, BSc, B.Com 🔍

Costing Techniques CBCAT5T08A

RTMNU B.Com Semester 5 · Major: Accounting and Taxation · Elective option A (choose one) · 4 units · notes for every unit

UniversityRTMNU – Rashtrasant Tukadoji Maharaj Nagpur University, Nagpur
CourseB.Com (Four Year UG Programme, NEP 2020)
SemesterSemester V
Paper codeCBCAT5T08A
Paper titleCosting Techniques
CategoryMajor: Accounting and Taxation · Elective option A (choose one)
Credits4 credits
Marks80 marks theory paper (3 hours)
Syllabusas per official RTMNU NEP 2020 B.Com syllabus for Sem V & VI (session 2026-27 onwards)

Unit topics below follow the official RTMNU syllabus. RTMNU official website · All RTMNU B.Com papers

Units

  1. 1Unit I: Process CostingNotes
  2. 2Unit II: Contract CostingNotes
  3. 3Unit III: Standard CostingNotes
  4. 4Unit IV: Operating CostingNotes

RTMNU B.Com Sem 5 · CBCAT5T08A · Unit I

Unit I: Process Costing

Syllabus topics (RTMNU)

  • Meaning, Features and Applicability of Process Costing
  • Difference between Job Costing and Process Costing
  • Preparation of Process Accounts
  • Treatment of Normal Loss, Abnormal Loss and Abnormal Gain
  • By-products (Basic Concepts)

Meaning, Features and Applicability of Process Costing

Process costing is a method of costing used in industries where production passes through a series of continuous processes and the output of one process becomes the input (raw material) of the next. Cost is collected process-wise and the cost per unit is the average cost of the process.

Features:

  1. Production is continuous and products are identical.
  2. Output passes through two or more processes in a fixed order.
  3. A separate account for each process is kept.
  4. Output of one process is transferred at cost to the next process.
  5. Losses (normal and abnormal) occur at different stages.
  6. Cost per unit = total cost of the process ÷ net output (an average).
  7. By-products and joint products may arise.

Applicability: textiles, sugar, paper, cement, chemicals, oil refining, soap, steel, pharmaceuticals, food processing.

Difference between Job Costing and Process Costing

BasisJob CostingProcess Costing
ProductionAgainst specific customer ordersContinuous, for stock
ProductsDifferent jobs, not identicalIdentical (uniform)
Cost unitEach jobEach process / unit of output
Cost ascertainedWhen the job is completedAt the end of the period
TransferNo transfer from job to jobOutput transferred to next process
Work-in-progressMay or may not be thereUsually present at start and end
ExamplePrinting press, furniture to orderSugar, cement, textiles

Normal Loss, Abnormal Loss and Abnormal Gain

  • Normal loss: the unavoidable loss expected under normal conditions (evaporation, shrinkage), fixed as a % of input. Its cost is borne by good units; scrap value is credited to the process account.
  • Abnormal loss: loss beyond the normal limit due to carelessness, machine breakdown or accident. It is valued like good units and transferred to the Abnormal Loss Account, and then (net of scrap value) to the Costing Profit & Loss Account.
  • Abnormal gain: when actual loss is less than normal loss. Valued like good units; debited to process account and credited to Abnormal Gain Account; the loss of scrap value on those units is adjusted, and the balance goes to Costing P&L.
Formula: Cost per unit = (Total cost − Scrap value of normal loss) ÷ (Input units − Normal loss units)
Abnormal loss/gain value = Units × Cost per unit

Illustration 1: Normal Loss and Abnormal Loss

Process A: 10,000 units introduced at ₹20 each; direct labour ₹75,000; overheads ₹50,000. Normal loss 10% of input; scrap sells at ₹10 per unit. Actual output 8,800 units transferred to Process B. Prepare Process A Account and Abnormal Loss Account.

Working: Normal loss = 1,000 units (scrap ₹10,000). Normal output = 9,000 units. Cost per unit = (3,25,000 − 10,000) ÷ 9,000 = ₹35. Abnormal loss = 9,000 − 8,800 = 200 units × ₹35 = ₹7,000.

Process A Account

Dr ParticularsUnits₹Cr ParticularsUnits₹
To Materials10,0002,00,000By Normal loss1,00010,000
To Direct labour75,000By Abnormal loss A/c2007,000
To Overheads50,000By Process B A/c (transfer @ ₹35)8,8003,08,000
Total10,0003,25,000Total10,0003,25,000

Abnormal Loss Account

Dr ParticularsUnits₹Cr ParticularsUnits₹
To Process A A/c2007,000By Bank (scrap 200 × ₹10)2002,000
By Costing P&L A/c (net loss)5,000
Total2007,000Total2007,000

Illustration 2: Abnormal Gain

Process B receives the 8,800 units (₹3,08,000) from Process A; labour ₹42,000; overheads ₹35,000. Normal loss 5% of input, scrap value ₹20 per unit. Actual output 8,500 units sent to finished stock.

Working: Normal loss = 440 units (scrap ₹8,800); normal output = 8,360 units. Cost per unit = (3,85,000 − 8,800) ÷ 8,360 = ₹45. Actual output 8,500 > 8,360, so abnormal gain = 140 units × ₹45 = ₹6,300.

Process B Account

Dr ParticularsUnits₹Cr ParticularsUnits₹
To Process A A/c8,8003,08,000By Normal loss4408,800
To Labour42,000By Finished stock (@ ₹45)8,5003,82,500
To Overheads35,000
To Abnormal gain A/c1406,300
Total8,9403,91,300Total8,9403,91,300

Abnormal Gain Account

Dr ParticularsUnits₹Cr ParticularsUnits₹
To Normal Loss A/c (140 × ₹20)1402,800By Process B A/c1406,300
To Costing P&L A/c (net gain)3,500
Total1406,300Total1406,300

Normal Loss Account: Dr — To Process B 440 units ₹8,800; Cr — By Abnormal Gain A/c 140 units ₹2,800, By Bank (actual scrap 300 × ₹20) ₹6,000. Total ₹8,800.

By-products (Basic Concepts)

A by-product is a product of small value produced incidentally along with the main product, e.g. molasses and bagasse in sugar, buttermilk in dairy. Treatment: (1) sales value credited to the process account or treated as other income (if small); (2) net realisable value (sales value less further processing and selling cost) credited to the main process; (3) standard cost method. Joint products, by contrast, are two or more products of almost equal importance (e.g. petrol, diesel, kerosene).

Likely exam questions

  1. (Long, 8/16 marks) What is process costing? Explain its features and distinguish between job costing and process costing.
  2. (Long, 8/16 marks) A product passes through Process X. Input 5,000 units at ₹30 each; labour ₹44,000; overheads ₹24,000. Normal loss 4% of input, scrap value ₹10 per unit. Actual output 4,750 units. Prepare Process X Account and Abnormal Loss Account.
  3. (Short, 4 marks) Distinguish between normal loss and abnormal loss.
  4. (Short, 4 marks) What is abnormal gain? How is it treated in cost accounts?
  5. (Short, 4 marks) What is a by-product? Give two examples.

RTMNU B.Com Sem 5 · CBCAT5T08A · Unit II

Unit II: Contract Costing

Syllabus topics (RTMNU)

  • Meaning and Features of Contract Costing
  • Types of contracts
  • Elements of contract cost
  • Nature of contract - completed contract
  • Work Certified and Work Uncertified
  • Determination of Profit on Incomplete Contracts

Meaning and Features of Contract Costing

Contract costing is a form of job costing used by contractors (builders, civil engineers, ship-builders) where each contract is a big job, usually carried out at the site and taking more than one accounting year. A separate Contract Account is kept for each contract.

Features: (1) work done at the customer's site; (2) each contract is a cost unit; (3) long duration; (4) most expenses are direct (materials, wages, plant); (5) progress payments are received on the basis of work certified by the architect, less retention money; (6) profit on incomplete contracts is taken on a conservative basis; (7) sub-contracting is common.

Types of Contracts

  • Fixed price contract: a fixed total price agreed in advance.
  • Cost-plus contract: contractee pays actual cost plus an agreed % of profit — used where cost cannot be estimated (e.g. defence, new projects).
  • Escalation clause contract: price is increased if costs of materials/labour rise beyond a limit.
  • Unit-rate contract: payment per unit of work (per sq. metre).

Elements of Contract Cost

  1. Materials — purchased for or issued to the contract (less returned, sold or at site at the end).
  2. Wages — paid and outstanding.
  3. Direct expenses — sub-contract charges, architect's fees, hire charges.
  4. Plant and machinery — either depreciation only, or full value debited and closing value credited.
  5. Overheads — share of head-office expenses.

Completed Contract; Work Certified and Uncertified

  • Completed contract: the full profit (contract price − total cost) is transferred to the P&L Account.
  • Work certified: value of work completed and approved by the contractee's architect/engineer, at contract price. Cash received = work certified − retention money.
  • Work uncertified: work completed but not yet certified; shown at cost.
  • Retention money: part of work certified held back by the contractee as security against defects.

Determination of Profit on Incomplete Contracts

Notional profit = (Work certified + Work uncertified) − Cost of work to date. Only part of it is taken to P&L (prudence; AS 7/Ind AS 115 apply in financial accounts, but the exam follows the traditional rule):

Stage of completion (Work certified ÷ Contract price)Profit to be credited to P&L
Less than 25%Nil — whole notional profit kept as reserve
25% or more but less than 50%1/3 × Notional profit × Cash received ÷ Work certified
50% or more (but not nearly complete)2/3 × Notional profit × Cash received ÷ Work certified
Nearly complete (90% and above)Estimated total profit × Work certified ÷ Contract price (or × Cash received ÷ Contract price)
Remember: If there is a notional LOSS, the whole loss is transferred to P&L immediately.

Illustration 1: Contract Account (Incomplete Contract)

Contract price ₹20,00,000. Materials ₹4,00,000; wages ₹3,50,000; direct expenses ₹50,000; plant issued ₹2,00,000; overheads ₹60,000. At year-end: materials at site ₹30,000; plant at site (after depreciation) ₹1,60,000; work certified ₹12,00,000; work uncertified ₹50,000; cash received ₹10,80,000 (90% of work certified). Prepare Contract Account.

Contract Account

Dr Particulars₹Cr Particulars₹
To Materials4,00,000By Materials at site30,000
To Wages3,50,000By Plant at site1,60,000
To Direct expenses50,000By Work-in-progress: Work certified12,00,000
To Plant2,00,000By Work-in-progress: Work uncertified50,000
To Overheads60,000
To Notional profit c/d3,80,000
Total14,40,000Total14,40,000
To Costing P&L A/c2,28,000By Notional profit b/d3,80,000
To Reserve (WIP) c/d1,52,000
Total3,80,000Total3,80,000

Working: Stage = 12,00,000 ÷ 20,00,000 = 60% (above 50%). Profit to P&L = 2/3 × 3,80,000 × 10,80,000 ÷ 12,00,000 = 2/3 × 3,80,000 × 90% = ₹2,28,000. Reserve = 3,80,000 − 2,28,000 = ₹1,52,000.

Balance sheet extract: Work-in-progress (12,00,000 + 50,000) ₹12,50,000 less Reserve ₹1,52,000 less Cash received ₹10,80,000 = ₹18,000 shown on the assets side.

Illustration 2: Profit at Different Stages

Notional profit on a contract is ₹1,20,000 and cash received is always 80% of work certified. Find profit to be credited to P&L if work certified is (a) 20%, (b) 40% and (c) 70% of the contract price.

CaseStageCalculationProfit to P&L ₹
(a)20% (below 25%)NilNil
(b)40% (25%–50%)1/3 × 1,20,000 × 80%32,000
(c)70% (50% and above)2/3 × 1,20,000 × 80%64,000

Likely exam questions

  1. (Long, 8/16 marks) What is contract costing? Explain its features and the rules for determining profit on incomplete contracts.
  2. (Long, 8/16 marks) Contract price ₹10,00,000; materials ₹2,00,000; wages ₹1,80,000; plant ₹50,000 (value at end ₹40,000); overheads ₹20,000; materials at site ₹10,000; work certified ₹5,00,000; work uncertified ₹20,000; cash received ₹4,00,000. Prepare Contract Account showing profit to be taken to P&L.
  3. (Short, 4 marks) Distinguish between work certified and work uncertified.
  4. (Short, 4 marks) Explain cost-plus contract and escalation clause.
  5. (Short, 4 marks) What is retention money?

RTMNU B.Com Sem 5 · CBCAT5T08A · Unit III

Unit III: Standard Costing

Syllabus topics (RTMNU)

  • Meaning and Objectives of Standard Costing
  • Types of Standards
  • Variance Analysis
  • Material Variances (Cost, Price, Usage)
  • Labour Variances (Cost, Rate, Efficiency)

Meaning and Objectives of Standard Costing

Standard cost is a pre-determined cost of a product or operation, worked out scientifically, showing what the cost should be under efficient conditions.

Standard costing is a technique of cost control in which standard costs are set in advance, actual costs are recorded, the two are compared, differences (variances) are analysed into causes, and corrective action is taken.

Objectives:

  1. Cost control by comparing actual with standard.
  2. Fixing responsibility — variances show which department is at fault.
  3. Management by exception — focus only on significant variances.
  4. Price fixing and quotations on a reliable cost basis.
  5. Budgeting and planning.
  6. Inventory valuation at standard cost.
  7. Cost consciousness and efficiency among employees.

Steps: set standards → record actual costs → compare → analyse variances → report → take corrective action.

Types of Standards

  • Ideal standard: attainable only under perfect conditions (no waste, no idle time) — rarely achieved; may demotivate.
  • Basic standard: set for a long period and not changed; used to study trends.
  • Current standard: set for a short period, reflecting current conditions.
  • Expected (attainable) standard: what can be achieved with efficient working, allowing for normal losses — most practical.
  • Normal standard: average standard expected over a business cycle.

Variance Analysis

A variance is the difference between standard cost and actual cost. It is Favourable (F) when actual cost is less than standard, and Adverse (A) when actual cost is more.

Material Variances

Formula:
Material Cost Variance (MCV) = (SQ × SP) − (AQ × AP)
Material Price Variance (MPV) = AQ × (SP − AP)
Material Usage Variance (MUV) = SP × (SQ − AQ)
Check: MCV = MPV + MUV
SQ = standard quantity for actual output; AQ = actual quantity; SP/AP = standard/actual price

Causes: price variance — change in market price, emergency purchases, loss of discounts, different quality; usage variance — wastage, poor quality material, unskilled workers, theft, faulty machines.

Illustration 1: Standard: 2 kg of material per unit at ₹50 per kg. Actual output 1,000 units used 2,100 kg at ₹48 per kg. Calculate material variances.

ItemWorking₹
SQ for actual output1,000 × 2 = 2,000 kg
Standard cost (SQ × SP)2,000 × 501,00,000
Actual cost (AQ × AP)2,100 × 481,00,800
MCV1,00,000 − 1,00,800800 (A)
MPV2,100 × (50 − 48)4,200 (F)
MUV50 × (2,000 − 2,100)5,000 (A)
Check4,200 (F) + 5,000 (A)800 (A) ✓

Interpretation: the purchase department bought cheaply (favourable price), but the production department wasted 100 kg (adverse usage).

Labour Variances

Formula:
Labour Cost Variance (LCV) = (SH × SR) − (AH × AR)
Labour Rate Variance (LRV) = AH × (SR − AR)
Labour Efficiency Variance (LEV) = SR × (SH − AH)
Check: LCV = LRV + LEV
SH = standard hours for actual output; AH = actual hours; SR/AR = standard/actual rate per hour

Causes: rate variance — wage increase, overtime, using higher-grade workers; efficiency variance — poor supervision, bad tools, untrained workers, poor material, low morale.

Illustration 2: Standard: 3 hours per unit at ₹40 per hour. Actual output 500 units took 1,450 hours at ₹42 per hour. Calculate labour variances.

ItemWorking₹
SH for actual output500 × 3 = 1,500 hours
Standard cost (SH × SR)1,500 × 4060,000
Actual cost (AH × AR)1,450 × 4260,900
LCV60,000 − 60,900900 (A)
LRV1,450 × (40 − 42)2,900 (A)
LEV40 × (1,500 − 1,450)2,000 (F)
Check2,900 (A) + 2,000 (F)900 (A) ✓

Interpretation: workers were paid more per hour than standard (adverse rate), but they finished the work in 50 hours less (favourable efficiency).

Advantages and Limitations of Standard Costing

Advantages: effective cost control, fixing responsibility, simplifies accounting and stock valuation, helps price fixing, encourages efficiency. Limitations: costly to set up, standards become outdated, difficult for small firms and non-standard products, may demotivate if standards are too tight.

Exam tip: Always write (F) or (A) after each variance and show the check (MCV = MPV + MUV). Many students lose marks for missing signs.

Likely exam questions

  1. (Long, 8/16 marks) What is standard costing? Explain its objectives and the types of standards.
  2. (Long, 8/16 marks) Standard: 4 kg per unit at ₹25 per kg; 5 hours per unit at ₹30 per hour. Actual output 800 units used 3,300 kg at ₹24 per kg and 3,900 hours at ₹32 per hour. Calculate material and labour cost, price/rate and usage/efficiency variances.
  3. (Short, 4 marks) What is a variance? Distinguish between favourable and adverse variance.
  4. (Short, 4 marks) State the causes of material usage variance.
  5. (Short, 4 marks) Calculate labour rate variance: actual hours 2,000 at ₹55; standard rate ₹50 per hour.

RTMNU B.Com Sem 5 · CBCAT5T08A · Unit IV

Unit IV: Operating Costing

Syllabus topics (RTMNU)

  • Operating Costing: Meaning and Features of Service Costing
  • Transport Costing (Passenger and Goods)
  • Cost Unit and Cost Sheet in Service Industry
  • Costing in Hospitality (Hotel/Restaurant) - Basic Concepts

Meaning and Features of Operating (Service) Costing

Operating costing (service costing) is the method of costing used by undertakings that provide services rather than goods — transport, hotels, hospitals, power supply, canteens, cinemas. Its aim is to find the cost per unit of service.

Features:

  1. No tangible product; services are rendered.
  2. Costs are mostly fixed (depreciation, salaries, insurance).
  3. A suitable composite cost unit is used (passenger-km, tonne-km, room-day).
  4. Costs are classified as standing (fixed) charges, running (variable) charges and maintenance charges.
  5. Cost per unit = Total cost ÷ Total units of service.
  6. Used for fixing fares/rates and comparing efficiency.

Cost Units in Service Industries

ServiceCost unit
Bus/passenger transportPassenger-kilometre
Goods transport (truck)Tonne-kilometre
HotelRoom-day / room-night
HospitalPatient-day / bed-day
ElectricityKilowatt-hour (kWh)
CanteenMeal / cup served
CinemaSeat-show

Cost Sheet in Service Industry (Transport) — Format

ParticularsPer month ₹Per unit ₹
A. Standing (fixed) charges: salaries of driver/conductor, garage rent, insurance, road tax, depreciation, salary of the managerxxxxxx
B. Running charges: diesel/petrol, lubricants, tyres, trip allowance of driverxxxxxx
C. Maintenance charges: repairs, overhaul, spare partsxxxxxx
Total operating cost (A + B + C)xxxxxx
Add: Profitxxxxxx
Fare / Chargesxxxxxx

Transport Costing: Passenger and Goods

  • Passenger-km = Number of passengers × Distance travelled (km).
  • Tonne-km (absolute) = Σ (Weight carried × Distance) for each stage.
  • Tonne-km (commercial) = Total distance × Average load per trip (average of loads at each stage).

Illustration 1: Passenger Transport

A bus with 50 seats runs between City A and City B, 40 km apart, making 2 round trips a day (160 km a day) for 25 days a month. On average 80% seats are occupied. Monthly costs: salaries ₹43,000; insurance ₹7,000; garage ₹5,000; depreciation ₹20,000; diesel ₹1,00,000; repairs ₹18,000; lubricants ₹7,000. Profit is 25% on cost. Find cost per passenger-km and fare per passenger from A to B.

Passenger-km per month = 50 × 80% × 160 × 25 = 1,60,000.

Particulars₹
Standing charges: Salaries 43,000 + Insurance 7,000 + Garage 5,000 + Depreciation 20,00075,000
Running charges: Diesel 1,00,000 + Lubricants 7,0001,07,000
Maintenance: Repairs18,000
Total operating cost2,00,000
Add: Profit 25% on cost50,000
Total takings required2,50,000

Cost per passenger-km = 2,00,000 ÷ 1,60,000 = ₹1.25. Fare per passenger-km = 2,50,000 ÷ 1,60,000 = ₹1.5625. Fare from A to B = 1.5625 × 40 = ₹62.50.

Illustration 2: Goods Transport (Tonne-km)

A lorry carries 6 tonnes from A to B (100 km), then 4 tonnes from B to C (50 km), and returns empty from C to A (80 km). Total cost of the round trip ₹9,200. Find absolute and commercial tonne-km and cost per absolute tonne-km.

StageLoad (tonnes)Distance (km)Tonne-km
A to B6100600
B to C450200
C to A0800
Total230800

Absolute tonne-km = 800. Commercial tonne-km = 230 × (6 + 4 + 0) ÷ 3 = 230 × 3.33 = 766.67. Cost per absolute tonne-km = 9,200 ÷ 800 = ₹11.50.

Costing in Hospitality (Hotel/Restaurant) — Basic Concepts

Hotels use room-day (one room occupied for one day) as cost unit for rooms, and cover/meal for restaurants. Costs: staff salaries, depreciation of building and furniture, electricity, laundry, linen, repairs, housekeeping supplies, food cost. Occupancy rate is very important because most costs are fixed.

Example: A hotel has 50 rooms; average occupancy 80% in a 30-day month = 50 × 80% × 30 = 1,200 room-days. Monthly cost ₹18,00,000 → cost per room-day = ₹1,500. With 20% profit on cost, room rent = ₹1,800 per day.

Exam tip: In transport problems, first calculate the composite unit (passenger-km or tonne-km) in a working note; then prepare the cost sheet with standing, running and maintenance charges separately.

Likely exam questions

  1. (Long, 8/16 marks) What is operating costing? Explain its features and the cost units used in different service industries.
  2. (Long, 8/16 marks) A bus of 40 seats runs 120 km a day for 30 days a month with 75% occupancy. Monthly fixed charges are ₹60,000 and running and maintenance charges ₹1,02,000. Calculate cost per passenger-km and fare per passenger-km if profit is 20% on cost.
  3. (Short, 4 marks) Distinguish between absolute tonne-km and commercial tonne-km.
  4. (Short, 4 marks) State the standing, running and maintenance charges of a transport undertaking.
  5. (Short, 4 marks) What cost units are used in hotel costing?